Two new rest stops, located at Km 47+500 on the Phan Thiet- Dau Giay highway, straddling the provinces of Dong Nai and Binh Thuan, opened on January 20th.

The entrances and exits to these rest stops are currently unpaved, with dirt roads leading in and out.

These rest stops span 12 hectares, with an investment of over 290 billion VND.

Inside the rest stop’s premises.

Numerous coaches and sleeper buses stop here to allow passengers to rest.

The parking lot inside the rest stop is paved.

The steps leading to the main building are made of plywood and iron bars.

Inside the rest stop.

The restrooms are spacious and clean.

Another rest stop, located at Km205 in Ham Thuan Bac district, Binh Thuan province, on the Vinh Hao- Phan Thiet highway, opened on January 24th, just in time for the Tet holiday rush.

The facilities at this rest stop include a parking lot and restrooms, which are temporarily operational.

However, many structures at this rest stop remain unfinished.

Entrance to the rest stop.

The exit remains a dirt road without a median divider.