A Sneak Peek at the $56 Million Palace of Youth After Nearly 3 Years of Construction

The Hanoi Children's Palace, a monumental project with an investment of over 1,300 billion VND, is nearing completion with multiple facets already finished. This exciting development is set to open its doors to the public by the end of 2024, offering a plethora of opportunities and experiences for the youth of Hanoi.

0
59

Hanoi’s new Children’s Palace is located in CV1 Park (located in the new Cau Giay Urban Area, Nam Tu Liem District, Hanoi) and spans almost 40,000 square meters with a total investment of over VND 1,300 billion.

According to PV’s observation, after nearly 3 years of construction, an 800-seat theater, a 200-seat cinema, a 500-seat gymnasium, a 10-lane swimming pool, classrooms, a library, an astronomical tower, and other facilities are essentially finished. This project is expected to be completed by the end of 2024.

Hanoi Children’s Palace boasts a modern architectural design that is spacious and close to nature, featuring smart and high-quality automated equipment for a safe, comfortable, and convenient environment for learning, playing, and entertainment.

Block B stands out with its 18-story astronomical tower, located within the block that houses the swimming pool, gymnasium, and library.

Block A features a dome-shaped roof, housing a theater, cinema, and art club inside.

Blocks A and B are in the final stages of completion, with equipment and machinery installation underway.

The new Children’s Palace is a key project for Hanoi during the 2020–2025 period. The completion of this project aims to meet the recreational, sports, physical education, and cultural exchange needs of the city’s youth, creating an environment conducive to nurturing the future talents of Hanoi.