West Thang Long Soon to Open: Sunshine Group’s Prime Location Project Takes Center Stage

As the final hurdles are cleared by the end of 2025, the Tay Thang Long Avenue is set to achieve full technical connectivity across its entire route by Q2 2026, ushering in a new era of connectivity for the western region of Hanoi.

0
17

West Thang Long Nears Completion, Ring Roads and Bridges Accelerate Development

By 2026, Western Hanoi will witness an unprecedented infrastructure surge, with simultaneous progress across strategic axes, including radial avenues, ring roads, and bridges spanning the Red River.

West Thang Long Avenue aims for technical completion by Q2/2026

At the heart of this transformation is the 33km West Thang Long Avenue, boasting a 60m-wide cross-section with 10 lanes, connecting Vo Chi Cong (Tay Ho) to Son Tay. Upon its technical completion in Q2/2026, travel times from Phuc Tho, Hoai Duc, and Dan Phuong to Tay Ho Tay—Hanoi’s new administrative and economic hub—will drop to under 20 minutes. This development physically and valuably integrates Western urban spaces with the city center.

Beyond a single route, West Thang Long intersects directly with Ring Roads 2, 3, 3.5, and 4, while linking strategic bridges like Thuong Cat (expected 2027) and Hong Ha (Q1/2028). This emerging multi-directional network promises seamless connectivity from downtown, the airport, to northern satellite provinces.

Hong Ha Bridge rendering, connecting O Dien and Me Linh communes (Hanoi)

Three Sunshine Group Projects Ride the Infrastructure Wave, One Luxury Development Transforms Daily

West Thang Long has long been the defining axis for Western Hanoi’s new urban landscape, attracting numerous projects from leading developers.

Sunshine Group stands out as a prime beneficiary, with three large-scale projects strategically located along or near this avenue: Noble Palace Garden (45 ha), Noble Palace Riverside (250 ha along an 11km riverfront), and Noble Palace Tay Thang Long WorldHotels Residences (70+ ha, 2,500+ European-style townhouses).

Among these, Noble Palace Tay Thang Long WorldHotels Residences is drawing significant market attention. Positioned between Ring Roads 4 and 3.5, adjacent to West Thang Long Avenue and National Highway 32, it features a 40m central axis connecting Extended Hoang Quoc Viet Street. This AI-integrated luxury urban development pioneers smart living in Western Hanoi.

Noble Palace Tay Thang Long WorldHotels Residences: A strategic Western Hanoi location

With nearly 2,500 meticulously planned townhouses, the project transcends traditional living spaces, fostering a specialized “business ecosystem.” It maximizes AI in operations, business support, and enhances customer experiences through 3D Mapping and Hologram technologies.

2,500+ European townhouses under synchronized construction, complemented by 5-star amenities: wellness hospitals, international schools, clubhouses, and two adjacent 200ha parks.

Operated under BWH Hotels’ WorldHotels standards, the project ensures internationally benchmarked service quality—a critical factor for investors evaluating low-rise property sustainability.

Noble Palace Tay Thang Long WorldHotels Residences features a central axis linking Extended Hoang Quoc Viet Street

Financially, buyers enjoy a 2% discount on installment payments, up to 9% annual discount for early payments, and bank loan support covering 70% of value at 0% interest for 24 months with principal grace during the interest-free period.

With its accelerated progress, transparent legal framework, and attractive policies, the project is hailed as one of the few “real-value” developments offering tangible progress, meeting both residential and business investment needs for long-term sustainable cash flow.

You may also like

Transformed Title:
“The 778 Billion VND Overpass at Hanoi’s Gateway: A Preview Before Completion”

The Kim Đồng – Giải Phóng underpass project in Hanoi has reached 90% completion and is now in its final sprint phase. With a total investment of 778 billion VND, this key infrastructure project is expected to open for technical traffic before the Lunar New Year of Bính Ngọ 2026.

Hanoi: Up-Close Look at the $360 Million Emergency Project to Alleviate Traffic Congestion

The Hanoi People’s Committee has issued an urgent decree for the construction of the Belt Road 2.5 project, encompassing key segments: Dich Vong New Urban Area – Duong Dinh Nghe, Vu Pham Ham – Tran Duy Hung, and Nguy Nhu Kon Tum – Nguyen Trai. This ambitious initiative boasts a total investment of 8.4 trillion VND.

Massive $1 Billion Tunnel Project Set to Transform Hong River Region

The Hanoi People’s Committee has announced plans to commence construction of a new road tunnel crossing the Red River in the northern area. The project, slated for investment in 2026, will connect Park Street in Ciputra Urban Area (Phú Thượng Ward) to National Highway 5 in Vĩnh Thanh Commune, enhancing regional connectivity and infrastructure.

Up-Close Look at the Construction Site of the 6-Lane Tran Hung Dao Bridge Spanning the Red River

The Trần Hưng Đạo Bridge project, boasting a 6-lane design and an investment exceeding 16,000 billion VND, connects from the Trần Hưng Đạo Intersection (Hai Bà Trưng) to Nguyễn Sơn Street (Long Biên).

The Military Enterprise Behind Vietnam’s $36 Billion Super Highway: Connecting the Legendary Ho Chi Minh Trail and the Prime Minister-Praised Phong Chau Bridge

The project is executed by Corps 12 – Truong Son Construction Corporation, a leading construction enterprise under the Ministry of Defense.