The 5th Ring Road: A 330km Long Project for the Hanoi Capital Region

The Hanoi People’s Committee’s plan to implement the Hanoi Party Committee’s action program to carry out Resolution 06 of the Politburo on planning, construction, management, and sustainable development of Vietnamese urban areas by 2030, with a vision towards 2045, includes a goal to prepare for investment and construction of the 5th Ring Road before 2030.

The people of Hanoi and the localities through which the 5th Ring Road will pass are highly anticipating this project. The operation of the 5th Ring Road will enhance inter-regional connectivity, facilitate transportation, and contribute to the socio-economic development of the related areas.

Based on the Prime Minister’s Decision in 2014 to approve the detailed planning of the 5th Ring Road of the Hanoi Capital Region, the road will have a total length of approximately 330km, excluding the 41km that overlap with the Noi Bai – Ha Long, Hanoi – Thai Nguyen, Noi Bai – Lao Cai, and National Highway 3 expressways.

AI ChatGPT illustration of the future 5th Ring Road

The project is designed as a 4-6 lane expressway with a minimum road width of 22-33m and auxiliary roads on both sides. With a total investment of about VND 85,000 billion, the project is expected to be completed before 2030.

The road will pass through the administrative boundaries of 8 provinces and cities: Hanoi (48km), Hoa Binh (35.4km), Ha Nam (35.3km), Thai Binh (28.5km), Hai Duong (52.7km), Bac Giang (51.3km), Thai Nguyen (28.9km), and Vinh Phuc (51.5km).

Recently, the People’s Committee of Bac Giang province proposed to the Prime Minister to allocate central government funds for the construction of the 5th Ring Road section passing through Bac Giang and Thai Nguyen provinces, with investment to be made before 2030.

Previously, the People’s Committee of Ha Nam province also made a similar proposal regarding the investment in the 5th Ring Road passing through their province. In response, the Ministry of Transport pledged to coordinate closely with the province in mobilizing capital and studying investment options to complete the ring road in the province as soon as resource conditions permit.

How Many Ring Roads Does Hanoi Have?

The approved transport planning of the Hanoi Capital by 2030, with a vision towards 2050, mentions that Hanoi will develop 7 ring roads. These roads will not only connect intra-city traffic but also link Hanoi with surrounding provinces and cities.

These ring roads form the foundation for the road transport framework in Hanoi and require investment to be completed synchronously as soon as possible. This will contribute significantly to ensuring balanced, comprehensive, and sustainable development for the city.

Prior to the 5th Ring Road mentioned above, Hanoi has been investing in and constructing other ring roads, including:

The 1st Ring Road runs through Nguyen Khoai, Tran Khat Chan, Kim Lien, Hoang Cau, and Voi Phuc – Ring Road 2 (from Cau Giay to Buoi). It is the main road connecting East and West through the center of Hanoi. Currently, only the section from Hoang Cau to Voi Phuc remains unfinished, creating a bottleneck that needs to be addressed to complete the entire route.

Ring Road 2 is currently an urban expressway that runs from Vinh Tuy Bridge through Nga Tu Vong, Nga Tu So, Nhat Tan Bridge, Dong Tru Bridge, Gia Lam underpass, and Dam Quang Trung, returning to Vinh Tuy Bridge. Some sections of this route are elevated, allowing vehicles to bypass traffic jams and move quickly within the city.

Ring Road 2. Photo: Truong Hung

Ring Road 2.5 is a supporting road that connects Ring Road 2 with Ring Road 3, passing through the West West Lake, Nguyen Van Huyen, Trung Kinh, Dam Hong, Kim Dong, and Linh Nam areas.

Ring Road 3 has been synchronously invested and constructed, including both elevated and ground-level sections. It runs from Thanh Tri Bridge through Linh Dam, Nguyen Xien, Khuat Duy Tien, Pham Hung, Pham Van Dong, to Thang Long Bridge, serving as a major transport axis in Hanoi.

Ring Road 3. Photo: VTC News

Ring Road 3.5 is a supplementary road between Ring Road 3 and Ring Road 4, connecting from Phap Van Expressway in Thanh Tri to Phuc La in Ha Dong, passing through Hoai Duc, Nam Tu Liem, Bac Tu Liem, and National Highway 32 to Thuong Cat Bridge.

Among the ring roads, Ring Road 4 is considered the most urgent and important project in Hanoi at present as it connects 5 provinces and cities in the Capital Region. The section passing through Hanoi is 56.5km long and runs through Soc Son, Me Linh, Dan Phuong, Hoai Duc, Thanh Oai, Thuong Tin, and Ha Dong districts. Construction of Ring Road 4 is currently being expedited.

Ring Road 4. Photo: thudo.gov.vn

You may also like

Choose La Mia Bao Loc – Embrace a Fulfilling Life with an Ideal Green Living Standard

Not just a perfect blend of art and inspired Italian-style resort, La Mia Dalat also effortlessly brings each resident to the standards of peaceful living, well-being, and balanced body-mind-soul.

Hanoi to have nearly 100m wide road soon

Hanoi is about to have a nearly 100m wide, 1.3km-long road connecting from Xuân Diệu street to the Tây Hồ villa area.

Hanoi to reclaim over 2,600 hectares of agricultural land in two districts

The plan for land use in 2024 for Hoang Mai district and Dong Anh district has just been approved by the city of Hanoi. As a result, a total area of over 2,600ha of agricultural land is expected to be reclaimed by these two units within the year.

Police Investigate Multi-Million Dollar Electrical Wire Theft on Phan Thiet – Dau Giay Highway.

In just 4 months, over tens of thousands of meters of electrical cables used for lighting on Phan Thiet – Dau Giay highway have been stolen, resulting in a total loss of over 3.6 billion VND.

Hanoi’s Update on the Delayed 1.000 billion VND Hospital Project

To address the challenges faced by investors, the Hanoi People’s Committee has instructed the Long Bien People’s Committee and the Department of Natural Resources and Environment to resolve any obstacles that arise during the implementation of the Thang Long 1,000-Year Oncology and Plastic Surgery Hospital project.